hyperhive/docs/jobq.md
iris 8363a459bf docs/jobq.md: drop the core-specific node table, keep only the abstract engine explanation
mara: "only the abstract jobq part was asked for in the first place" —
the previous revision still carried the full hive-c0re step-kind table
under a "core-specific nodes" heading; that catalogue belongs in
coordinator.md (where it already lived) alongside the rest of
hive-c0re's job-queue internals, not duplicated here.

jobq.md is now just the domain-agnostic model (graph of steps + shared
resource slots) plus the generic row/step/glyph framing for watching it
in the dashboard — no hive-c0re-specific step names anywhere.
Coordinator.md's job-queue section, docs/README.md, and the root
CLAUDE.md reading-paths index are updated to match.
2026-08-26 22:50:49 +02:00

52 lines
2.8 KiB
Markdown

# The job queue, for operators
Every container operation — rebuild, first-spawn, a config-PR deploy,
power changes — runs through one shared job queue. This page explains
what the job queue *is*, as a general idea, independent of what any one
subsystem uses it for. For the hive-c0re-specific step catalogue and the
engineering internals (scheduler, leases, resource windows) see
[`coordinator.md`](coordinator.md) instead.
## What the job queue is, in the abstract
"jobq" is a generic engine for running many interdependent jobs under
limited concurrency — it has no idea what a "container" or a "rebuild" is.
Two ideas are all there is to it:
- **A job is a small graph of steps**, not one opaque blob. Steps can
depend on each other (this step only starts once that one finishes), so
a big operation is really a short, ordered sequence — not a single
black box that's either "done" or "not done."
- **A step can need a shared resource**, which only so many steps can hold
at once (a "slot"). If every currently-running step already holds the
slots it needs, a new step that wants the same one waits its turn —
that's the whole reason things queue instead of all firing at once.
The engine's whole job is: whenever a step's ordering and resource needs
are both satisfied, run it. It has no opinion on what the steps *do*
that's supplied by whoever builds the graph. hive-c0re is the one thing
building graphs on it today, but nothing about the engine is specific to
containers or rebuilds; there's nothing stopping another subsystem from
using the same engine for its own unrelated queue.
## Watching it happen
Each **row** you see in a queue view (the **BU1LDS** page's R3BU1LD QU3U3
— see [`web-ui/dashboard.md`](web-ui/dashboard.md) — and swarm-ui's
`/jobs` page both render the same underlying graph) is one job; the rows
nested under it are that job's steps, in order (occasionally a couple run
side by side). A step shows one of:
| Glyph | Meaning |
| ----- | -------------------------------------------------------- |
| `⏸` | queued, waiting its turn |
| `▶` | running |
| `◐` | its own work is done, waiting on a step nested under it |
| `✔` | finished successfully |
| `✖` | failed |
| `⊘` | cancelled |
| `·` | skipped (not needed for this run) |
A step that isn't needed for a given run shows as `·` rather than being
left out of the tree entirely, so the same kind of operation keeps a
recognizable shape run to run, whichever steps it actually needed.