| Filename | Latest commit message | Latest commit date |
|---|---|---|
Follow-up to the themed-modal component: route every remaining native browser dialog through modal.js so nothing falls back to the OS chrome. - modal.js: add themedPrompt (input dialog) + themedToast (non-blocking transient notification, info/error/ok) alongside openDialog/themedConfirm. - Migrate call sites: bindAsyncForms confirm/prompt/alerts (common.js), the answer-validation alert (call.js), the M0V3 reparent confirm + action toasts (tabs.js), and the schedule form/cancel/fire confirms + validation and error alerts (schedules.js). - UX: blocking modal for confirms/prompts; non-blocking toast for transient errors + validation. Destructive confirms keep the danger styling. - CSS for the toast stack + prompt input. common.js <-> modal.js is a safe deferred import cycle (usage is call-time only); esbuild bundles it clean. |
||
| .. | ||
| packages | ||
| .gitignore | ||
| package-lock.json | ||
| package.json | ||
| README.md | ||
hyperhive frontend
npm workspaces project for the hyperhive browser-facing assets:
packages/shared/— shared modules used by both surfaces (terminal pane, Catppuccin palette + body typography).packages/dashboard/— the hive-c0re dashboard SPA.packages/agent/— the per-container web UI (default agent page, stats, screen).
Build
npm install # one-off; uses the checked-in package-lock.json
npm run build # builds every workspace into packages/*/dist/
The Rust binaries serve packages/dashboard/dist/ and
packages/agent/dist/ via tower_http::ServeDir at runtime; the
build derivation is wired up in nix/modules/frontend.nix. Per-agent
additions are layered on top of the default agent dist via the
hyperhive.frontend.extraFiles option in agent.nix.
Why npm + esbuild
- Hermetic: dependencies vendored via the checked-in lockfile;
buildNpmPackagein nix uses it as the source-of-truth so the output is reproducible without network access at build time. - esbuild: vanilla-JS bundler, no framework runtime overhead.
Each workspace's
build.mjsis ~30 lines. - Single-PR migration: see issue #273 for the design proposal and the four-commit shape (npm scaffold → nix derivations → container plumbing → Rust cutover).