The two-phase approval deploy keeps a bumped `flake.lock` staged
uncommitted for the whole container build, so no other meta mutation may
land inside that span — until now enforced by a process-global
`meta::exclusive()` mutex held inside each executor fn.
A `MutexGuard` cannot outlive the fn that takes it, which is what blocks
decomposing the opaque `ApprovalDeploy` node into scheduler-visible
sub-nodes: the window has to span them. Replace the mutex with
`Resource::MetaWindow`, a global capacity-1 queue resource declared by
every meta-mutating node kind (`NodeKind::needs_meta_window`). Resources
are held by a subtree root across its whole subtree, so a later increment
can hang the deploy's phases under one window-holding parent.
Same global serialisation as before, and the scheduler now blocks a node
from being claimed rather than parking a worker on a mutex.
Split the rebuild's meta preamble out of `Prebuild` into a new `MetaSync`
node. `Prebuild` must NOT hold the window: the old mutex was deliberately
scoped to drop before the multi-minute toplevel build, which only reads
the store, and a cap-1 global held across it would serialise every
agent's rebuild behind every other's. `MetaSync` is a sibling root that
`Prebuild` deps `AfterOk` on — not its parent, since a parent's resource
covers its whole subtree and would reintroduce exactly that problem.
Queue tests: shape assertions gain the extra node, which is the point of
the change (phases become nodes). The concurrency invariants are intact
but observed one step later — the `MetaSync` heads take turns on the
window, exactly as the runtime mutex made them, so those tests now
complete the heads before asserting that the prebuilds overlap.