Non-derivable per-node payload rides the node that owns it. Tagging all
four deploy nodes with the approval id would render the same card four
times in `dag_view`.
Also fix `set_queue_step`'s doc comment, which claimed the DAG-id lookup
was exact because approval DAGs are single-node. They are not anymore;
what actually holds is that the chain is strictly sequential with the
root parked in Finishing, so at most one node is ever Running.
`run_approval_merge_config_pr` and `run_merge_config_pr` are gone; the
three phases are `run_deploy_merge_verify` (drift gate, fetch, verify —
mutates nothing), `run_deploy_apply` (merge + build) and
`run_deploy_tail` (compensation + push).
The rollback state is a git ref in the applied repo
(`refs/hyperhive/rollback/<approval-id>`) rather than a value handed
between nodes, because hive-c0re can restart between the apply and the
tail and the tail still has to know what to undo.
Rolling `main` back on a *successful* deploy is the worst thing the tail
can do, so it is guarded twice: the apply drops the rollback ref before
it plants `deployed/<id>`, and the tail refuses to compensate at all if
`deployed/<id>` resolves. It takes two independent git failures to get
there.
`run_deploy_tail` returns nothing and warns on every error — a failing
compensation must not mask the deploy's own verdict, which the terminal
hook takes from the DAG's roll-up.
A config-PR deploy was one opaque node that fetched, verified, merged,
built and compensated. That shape made three things impossible: the
nix-heavy phases could not take the meta window without the cheap ones
holding it too, a crash mid-build left no node to run the rollback, and
the dashboard could only ever show "deploying" for the whole thing.
Replace it with a `DeployWindow` group root over `MergeVerify ->
DeployApply` (AfterOk) plus a `DeployTail` hanging off the apply with
AfterAny, so the tail runs whether the apply succeeded, failed, or was
cancel-cascaded by a failing verify.
The two-phase approval deploy keeps a bumped `flake.lock` staged
uncommitted for the whole container build, so no other meta mutation may
land inside that span — until now enforced by a process-global
`meta::exclusive()` mutex held inside each executor fn.
A `MutexGuard` cannot outlive the fn that takes it, which is what blocks
decomposing the opaque `ApprovalDeploy` node into scheduler-visible
sub-nodes: the window has to span them. Replace the mutex with
`Resource::MetaWindow`, a global capacity-1 queue resource declared by
every meta-mutating node kind (`NodeKind::needs_meta_window`). Resources
are held by a subtree root across its whole subtree, so a later increment
can hang the deploy's phases under one window-holding parent.
Same global serialisation as before, and the scheduler now blocks a node
from being claimed rather than parking a worker on a mutex.
Split the rebuild's meta preamble out of `Prebuild` into a new `MetaSync`
node. `Prebuild` must NOT hold the window: the old mutex was deliberately
scoped to drop before the multi-minute toplevel build, which only reads
the store, and a cap-1 global held across it would serialise every
agent's rebuild behind every other's. `MetaSync` is a sibling root that
`Prebuild` deps `AfterOk` on — not its parent, since a parent's resource
covers its whole subtree and would reintroduce exactly that problem.
Queue tests: shape assertions gain the extra node, which is the point of
the change (phases become nodes). The concurrency invariants are intact
but observed one step later — the `MetaSync` heads take turns on the
window, exactly as the runtime mutex made them, so those tests now
complete the heads before asserting that the prebuilds overlap.
Two tests asserted the old behaviour where completed nodes/DAGs stayed
in the snapshot. Under the redesign, Done nodes are filtered off the wire
(a fully-Done DAG disappears; a Failed one lingers + is history-capped):
- failed_node test: the completed reconcile is Done → assert it's absent,
not Done-present (its run is already verified by the claim).
- history-eviction test: fail the nodes so the DAGs linger (Done ones
would vanish), then assert the grace window + per-template cap.
The raw-graph wire drops the inline build_log_id; the client fetches a
node's captured output on demand. Two handlers resolve node id -> log-row
id (JobQueue::build_log_id_of, now keyed by the wire u64) then delegate to
the existing get_full / raw handlers: /api/build-log/<node_id> serves the
BuildLogFull JSON ({stdout, stderr} + header), /raw serves text/plain.
404 when the node has no linked log.
Reconcile with mara + argus's review on the frontend PR (#2660):
- DagView regains started_at/finished_at (DateTime<Utc>), computed
host-side as min/max over ALL subtree nodes (including the Done ones
filtered off the wire). The client can't derive these — the
earliest/only-started node is often Done and absent — so the backend
sets them, per mara's call.
- NodeView gains has_log: bool = build_log_id.is_some(), the precise
old 'node has a captured build log' guard so the dashboard only shows
a log link for nodes that actually produce one.
Now that Template is internal to hive-c0re (not a pub wire enum), the
dead-code lint flags the two variants nothing ever constructs. Removed
them + their as_str arms; terminal_hook's catch-all arm is unaffected.
- server::await_dags: a DAG is settled when gone from the snapshot (fully
Done) or present with all nodes terminal; pending only with a non-terminal
node (DagView no longer carries a rolled-up state).
- DagView::rollup_state() added to hive-sh4re — the shared node-set roll-up
derivation every Rust consumer uses.
- JobQueue::build_log_id_of(node_id) — the node_id -> build_logs lookup the
query endpoint will use; tests assert log-id via it now.
- tests: derive roll-up state; drop the off-wire step/build_log_id wire asserts.
hive-c0re side of the raw-graph wire: dag_view now projects the slim
DagView, reading started_at/finished_at/error straight off the
hive_jobq Node (removes the node_rt double-write from #2645), excludes
Done nodes, and rides approval_id/inputs on the owning node. Template
moved into hive-c0re (model.rs) — no longer on the wire. Still WIP:
build-log endpoint + hivectl derive + compile fixes to follow.
Node gains started_at/finished_at (chrono DateTime<Utc>, serialized
RFC 3339 on the wire per hive_sh4re::wire_time) plus error (String).
Graph::set_state self-stamps started_at on the first Running transition
and finished_at on the first terminal one, via an internal now_utc()
clock (keeps settle/complete signatures stable). Outcome::Failed(String)
carries the failure reason, set on the terminal transition.
hive-c0re complete_node builds Outcome::Failed(msg); its node_rt
side-table stays i64 for now (double-write) until #2637 reads the Node.
Toward #2637: the jobq graph becomes the source of truth for per-node
lifecycle so the queue can be sent to the client as-is.
Replace the in-tree scheduler with the domain-agnostic hive-jobq crate
(merged in #2615): parent-axis grouping + borrow/subtree-reservation
resource model + roll-up completion (State::Finishing).
Host adaptation:
- NodeSpec gains an explicit `parent` axis; templates declare grouping +
sibling ordering directly (deps order execution, parent groups a subtree
whose resource the descendants borrow).
- Rebuild is a nested two-root subtree: Prebuild (root, owns the build slot
for the whole subtree, lease-exempt) -> StopForUpdate (child, owns the
agent lease) -> Swap/PostSwap (children, borrow both); Reconcile is a
separate top-level root (AfterAny Prebuild) so it survives the cancel-
cascade of any failed step (recovery-start invariant) and converges to
the persisted `wanted` on a fresh lease. This is the multi-root
correction to the single-root-chain sketch: node0=root broke lease-
exemption (hoisting the lease onto Prebuild) and recovery-reconcile
(root failure cancels all children).
- Spawn / perm-change / power-ops (stop/start/restart) group-rooted the
same way; per-agent power-op subgraphs stay independent roots so a
multi-agent DAG runs them concurrently, each on its own lease.
- insert_group honours the explicit parent axis (no lease hoisting); the
DAG terminal node deps AfterAny on every group root and runs once the
whole op rolls up. Drop the old Graph::add_dep terminal wiring.
36/36 job_queue tests, full hive-c0re suite green, clippy --all-targets.
The boot provisioning pass (orgs, repos, teams, CI-runner token) all hits
the Forgejo API, but ensure_all only checked the container is *present*,
not that its HTTP is *listening*. A nixos-rebuild that restarts hive-forge
and hive-c0re together races: every ensure_* fired at a refused socket and
left a stale 'provisioning failed' banner that never cleared, since the
pass is one-shot. Poll GET /api/v1/version (unauthenticated) until it
answers, bounded at 1 minute, before provisioning; on timeout proceed
anyway so a genuinely-down forge still surfaces its real errors. Mirrors
the readiness-retry the gateway-nginx path already has.
sync_agent() now returns bool (false if any step fails). ensure_all()
collects the names of agents whose sync failed and raises a single
set_boot_warning with the aggregated list:
forge: per-agent sync failed for: alice, bob (see journal for per-step
detail)
The static_kind() leak is already used for per-org boot warnings in the
same file — the leak is bounded (one per hive-c0re boot, not per request)
so reusing it here is appropriate.
The rebuild call site in job_queue/exec.rs discards the bool return and
keeps its existing tracing::warn! lines, which is the right separation:
rebuilds are their own retry loop and don't need to post a persistent boot
warning.
Extends GET /api/journal/{name} to also accept the four hive infra
container names (hive-ci, hive-forge, hive-gateway, hive-matrix —
hive_priv_sock::InfraContainer is the allowlist), reusing the same
journalctl -M / hive-priv delegation path already used for agent
containers. Infra containers don't run the per-agent hive daemons, so
the unit filter is skipped for them — always the full machine journal.
Frontend: the AGENT tab's agent selector now lists infra containers
in a separate optgroup (sourced from /api/state's existing
infra_containers field), and disables the unit-filter select when one
is chosen.
Both warn!-and-forget sites in ensure_ci_runner_registered() now also
call set_boot_warning():
- fetch_registration_token failure → crit banner (forge unreachable or
API error; runner stays with stale/absent creds)
- hive-priv register_ci_runner failure → crit banner (EROFS or priv
socket error; runner token not written)
Both are only ever invoked from ensure_all() at hive-c0re startup (no
periodic retry), so set_boot_warning() is the right API: the banner
persists until the next c0re restart that re-runs the step, which is
exactly when a config/environment fix (e.g. the ReadWritePaths EROFS
fix from 64075107) would take effect.
Journal warn! lines are kept alongside the banner (belt-and-suspenders).
Remaining in scope for #2289: sync_agent() warn! sites (called from
both startup and rebuild paths — needs set_warning RAII or explicit
return value to enable later success to clear the banner; left for a
follow-up).
Forgejo returns team-already-exists as HTTP 422 ValidationFailed, not
409 Conflict, so the 409-only guard in ensure_operators_team missed it
and logged a spurious warning every boot (and skipped the settings
reconcile). Add a lenient discriminator that also treats a 422 whose
message says already-exists as benign.