docs/4-implementation/scheduler/ci.md described both the swarm-ci-runner product (hosting, registration, security, store maintenance) and this repo's own pipeline (which jobs run on a PR, the local equivalents, the nightly VM tests). The second part is project process: it moves, whole and in order, to docs/5-project/process/ci-checks.md, with a pointer left behind, an entry in the docs index and the one doc comment in hive-forge that named the old section updated.
A stuck test in the shared job was cut at the runner's one-hour limit and hid the other tests' results. The matrix list is static; check-vm-test-list.sh fails CI when it differs from nix/vm-tests.nix.
Each service section lost its container, credential and metrics detail to a
Host setup section on its own implementation page, unchanged apart from links.
The four agentAuth option rows that sat above the page title moved into the
telemetry page's metrics option table.
Adds checks.<system>.vm-test-typecheck-<name> for hive-squid, swarm-archive, agent-ephemeral-rootfs, full-setup and wg-hive: ty and ruff F over nixpkgs' test-script prelude, the machine hints from the node names, and the script text. Node configs are never evaluated. vm-test-typecheck-control passes only when ty rejects a known type error.
Every docs directory moves under 1-getting-started, 2-handbook,
4-implementation or 5-project; the options reference (section 3) comes from
the website and has no directory here. trust-boundary stays whole under the
handbook for now. web-ui, swarm and tools split between handbook and
implementation, and the command-line references move to
2-handbook/reference. Links, path references in code and nix, and the docs
index follow the moves; no page content changes.